Metal Building Cost — METCO Metal Building Supply
Cost · Quotes

Metal Building Cost

Metal building cost on the coastal plain is driven by size, roof, doors, certification, and distance — not by a scraped internet sticker. METCO quotes installed custom metal buildings from Farmville production and Greenville lots. No builder required — METCO builds and installs the building (no separate contractor for the steel building). No fake dollar amounts on this page.

Get a Free Quote →📞 (252) 375-3651

No builder required

METCO builds and installs — no separate contractor for the steel building.

Primary phone

(252) 375-3651

Address

METCO Metal Building Supply, 1940 N Memorial Dr, Greenville, NC 27834

Plant

Farmville, NC (not Greenville)

Pricing

Installed quote

Drivers

Size · roof · doors · certs · distance

CTA

Call for a free quote

No builder required — we build & install

METCO manufactures, delivers, and installs your metal building. You do not need a separate builder or contractor for the steel building itself — we build it and set it up. Call (252) 375-3651.

What actually moves metal building cost

Width costs more than length because clear-span framing scales with span. Vertical roofs, extra roll-ups, walk-ins, insulation, and certified wind drawings add line items. Site distance beyond the free radius and difficult access matter. Related metal-building-prices and steel-buildings-prices use the same rules.

Installed cost vs kit-only ads

Kit-only ads look cheaper until you hire a crew. Our quotes include manufacture, delivery, and setup within 100 miles of any METCO lot — compare apples to apples. Concrete, electrical, and permits remain separate when required.

How to get your number

Call (252) 375-3651 with preferred width/length, roof style, door count, and county. Visit METCO Metal Building Supply, 1940 N Memorial Dr, Greenville, NC 27834.

Specifications

Phone
(252) 375-3651
Plant
Farmville, NC (not Greenville)
Address
METCO Metal Building Supply, 1940 N Memorial Dr, Greenville, NC 27834
Quote
Often within 24 hours
Delivery
Free within 100 miles
Model
Installed custom steel

Common Questions

Do I need a separate builder for a METCO metal building?

No builder required for the steel building. METCO builds and installs it — manufacture, delivery, and setup. Call (252) 375-3651.

Is the plant in Greenville?

No. Manufacturing is in Farmville, NC. Greenville, NC has sales lots only — the plant is in Farmville. Call (252) 375-3651.

Why won't you list metal building cost ranges here?

Published fake ranges mislead. Call for an installed quote matched to your options.

What do I need for an accurate cost?

Size, roof, doors, county, and certification needs. Call (252) 375-3651.

Does cost include installation?

Standard quotes include delivery and setup within 100 miles of any METCO lot.

Where is the plant?

Farmville, NC. Lots: METCO Metal Building Supply, 1940 N Memorial Dr, Greenville, NC 27834.

Get a Real Number in 24 Hours

Tell us the size, your county and what you are storing. We quote from current steel pricing — no obligation, and we will tell you if a different size suits you better.

Request a Quote →Design It in 3D