Metal Building Contractors — METCO Metal Building Supply
Supplied & Erected

Metal Building Contractors

We manufacture the steel and we put the building up. One company, one invoice, one place to call when something is not right — instead of a supplier and an erector pointing at each other.

Get a Free Quote →📞 (252) 375-3651

One point of accountability

We form the steel, deliver it and erect it.

Free erection within 100 miles

Delivery and installation included from any of 28 lots.

Certified drawings

Sealed engineering for plan review where required.

Anchors sized to your soil

Not a default spec applied to every site.

Four states

NC, SC, VA and GA from our Farmville roll-forming plant.

Straight about scope

We do structure. We will tell you who you need for the rest.

The split-responsibility problem

The most common way a metal building project goes wrong is not steel failure — it is a gap between the company that sold the kit and the crew that erected it. Panels arrive short, anchors are wrong for the soil, the slab is an inch out and nobody owns the fix. When one company forms the steel, delivers it and erects it, there is nobody to hand the problem to. That is the practical case for buying supply-and-erect rather than sourcing separately.

What we handle and what we do not

We handle the structure: steel, delivery, anchoring and erection, plus certified engineered drawings where your county requires them. We do not pour concrete, run utilities, grade sites or do interior finish. Some contractors will tell you they do everything and subcontract most of it. We would rather be clear about the line so you know who to line up for the rest — and we are happy to tell you what your slab needs to look like before you pour it.

Site conditions decide more than people expect

Two identical buildings on two different sites are not the same job. Level ground with truck access is straightforward. A sloped site, soft soil, tight access or a long carry from the road all change the work. We would rather ask about your site before quoting than discover it on delivery day. If your site needs prep, we will tell you what and roughly what it costs, even though we are not the ones doing it.

Permits, drawings and inspections

Requirements vary considerably by county across NC, SC, VA and GA, and coastal counties carry wind-load rules inland counties do not. We provide certified engineered drawings for the structure when your building department asks. You or your general contractor pull the permit and schedule inspections — we will tell you honestly what your jurisdiction typically wants so there are no surprises at plan review.

Specifications

Scope
Manufacture, deliver, anchor, erect
Not included
Concrete, grading, utilities, interior finish
Engineering
Certified drawings available
Free install radius
100 miles from any lot
Coverage
NC, SC, VA, GA
Building types
Garages, shops, barns, commercial, carports

Common Questions

Do you erect the building or just supply the steel?

Both. We roll-form the panels at our own plant, deliver, anchor and erect the building. Erection is included free within 100 miles of any of our 28 lots across NC, SC and VA. You can also buy materials only if you or your own crew are erecting.

Do I need a concrete slab before you arrive?

It depends on the building. Carports and many agricultural structures can be installed on level ground with rebar anchors. Enclosed garages, shops and anything permitted usually want a slab. If you are pouring, talk to us first — we will give you the dimensions and anchor-bolt layout so the slab matches the building rather than the other way round.

Who pulls the permit?

You or your general contractor pulls the permit and schedules inspections. We supply certified engineered drawings for the structure when your building department requires them, and we will tell you what your county typically asks for. Requirements vary a lot between counties, so check locally before ordering.

How long does erection take?

A standard carport or garage often goes up in a day. Larger commercial structures take longer. The schedule is usually driven by permitting, site prep and slab cure time rather than the steel itself — we will give you a firm materials date so you can sequence around it.

Can you build on a sloped site?

Often, yes, but it changes the job and sometimes the price. Slope, soil type, access and carry distance all matter. Tell us about the site when you ask for a quote rather than after — it is the single biggest source of surprises on delivery day.

Related

Metal Building ManufacturersCommercial BuildingsMetal GaragesMetal Building Prices

Get a Real Number in 24 Hours

Tell us the size, your county and what you are storing. We quote from current steel pricing — no obligation, and we will tell you if a different size suits you better.

Request a Quote →Design It in 3D