What exactly does METCO supply, and what is left for me to do?
METCO supplies the steel shell: galvanized framing, 29-gauge roof and wall panels, and the roll-up doors, walk doors and windows framed in where your layout calls for them, delivered and installed on your site by METCO's own crew. Widths run from 12 to 60 feet with no interior posts, leg heights from 9 to 12 feet, and insulation can be added to the panels as an option. Left to you: the concrete slab, electrical service, plumbing if the building needs it, and any interior finish. METCO gives you the footprint and anchor layout so your concrete contractor can pour before the crew arrives.
Which METCO lots serve Piedmont and Powdersville?
There is no METCO lot inside Piedmont, but three are close enough that the choice comes down to which direction you already drive. Pelzer, SC is the nearest at 9491 Augusta Rd, Pelzer, SC 29669, phone (864) 745-5427, about 4 miles south on US 29. Williamston, SC at 980 Beaverdam Rd, Williamston, SC 29697, phone (864) 840-9033, is about 6 miles. Easley, SC at 4314 Calhoun Memorial Hwy, Easley, SC 29640, is about 10 miles; that lot is reached through METCO's main line, (252) 375-3651. Every lot is open Monday through Saturday, 9am to 5pm. For a shop or commercial building it is worth visiting in person to talk through leg height, span, door placement and certification with your layout in hand before committing to a footprint. All 28 lots are at /locations/.
How should I plan a slab on Anderson County red clay?
The ground between the Saluda River and Powdersville is Upstate red clay, which swells when wet and shrinks when dry. Grade the pad so water runs away from it, compact the base, and have the slab poured to the building's footprint and anchor layout with the edges thickened where the base rail sits. Pour and cure before delivery day; the building is anchored the day it is installed, so a slab that is soft or out of square stalls the job. If the building will be heated or cooled, insulate the slab edge and choose panel insulation at order time.
Why do steel building quotes vary so much, and how does METCO price the shell?
Six things set the number: width, length and leg height; 14-gauge versus 12-gauge framing; certified engineered drawings where Anderson County requires them; the count of roll-up doors, walk doors and windows; insulation if you add it; and the steel market that day. METCO quotes from current steel pricing, usually within 24 hours, rather than publishing a price list that would be stale in weeks. The slab and site work are quoted by your own contractors and are outside the steel number, so compare quotes on the same scope.
Can I start with a garage in Piedmont and add on later?
Yes. A lean-to can be added along either side of a METCO building, and buildings can be lengthened in 5-foot bays if you leave the end wall accessible. Many Powdersville owners start with a 30x40 shop and add a covered side for a trailer or boat a year later. Tell the Pelzer lot what you might add so the door and end-wall positions leave room for it.