What can I verify before I hand over any money?
Start with identity. Get the legal business name, physical address and phone, and confirm the address is real; a manufacturer should have a plant you can visit and a dealer should have a lot where buildings stand. Where your state requires a contractor license for the size or type of work, ask for the number and look it up with the licensing board yourself. Ask for a certificate of insurance showing general liability and workers' compensation, then call the insurer or agent listed on it to confirm it is current; a certificate is a piece of paper and only the issuer can validate it. Ask who installs and whether they are employees or subcontractors. Ask for recent installations in your county you can drive past. None of this takes long, and a company that does this every week will have it ready. Hesitation on any item is your signal.
What should the written agreement contain?
A scope you could hand to a stranger and have them build the same building. That means width, length, leg height, roof style, framing gauge, panel gauge, color, trim, every door and window by size and location, anchoring method, whether certified engineered drawings are included, the delivery address, and a statement that installation is included. It means a price that is fixed for a stated period, a change-order policy, and a delivery window. It means payment terms: the deposit amount, what it is refundable against, and when the balance is due. It means what happens if the county denies the permit. And it means signatures from both parties on the same document. Verbal add-ons are not part of the deal. If a salesperson promises something, ask them to write it on the agreement and initial it. A written scope protects the honest contractor as much as it protects you.
How should payments be structured to protect me?
Tie money to things you can see. A modest deposit that secures fabrication is normal; a demand for most or all of the price before anything is delivered is one of the biggest warning signs in the industry. Ask for the balance to fall due at delivery and completed installation, after you have walked the building and checked doors, trim and anchors. Pay by a method that leaves a record. At final payment, ask for a lien waiver from the installer and any subcontractor so nobody can later claim against your property for work you already paid for. If rent-to-own is offered, read the whole agreement: the payment schedule, the buyout terms, what constitutes default, and whether the building can be removed. METCO offers rent-to-own with no credit check on qualifying buildings, manufactures the panels itself and installs the building with no separate contractor, which keeps the money and the accountability in one place.
What are the red flags worth walking away from?
Pressure to sign today because the price expires tonight. A deposit demanded in cash or by a method with no record. No physical address, or an address that turns out to be a mailbox. A license number that does not match the licensing board's record, or an insurance certificate the insurer cannot confirm. A scope that will not be put in writing, or a quote that omits gauge, doors or installation. A refusal to say who manufactures the steel or who installs it. A claim that your county never requires permits or engineered drawings, when the inspections office says otherwise. A delivery date that keeps moving after payment. Any one of these has an innocent explanation sometimes; two or three together do not. Keep the emotion out of it: you are not accusing anyone, you are declining to proceed until the paperwork matches the promise.
What do I check on installation day and after?
Before the crew leaves, walk the building with them. Sight down the eave and ridge for straight lines, check that panels are lapped against the weather and screws are seated with washers intact, operate every door, confirm trim is complete at every edge, and look at the anchors against the drawings. Ask for the signed scope, the engineered drawings if any, the permit and inspection record, and a receipt marked paid. Photograph everything, including the crew's truck and the pad. If the county requires a final inspection, do not make the last payment until it passes or until the contractor has agreed in writing to correct anything the inspector flags. Keep the whole folder; it is what your insurer, lender and eventual buyer will ask for, and if a problem appears later it tells you exactly who is responsible for what.