Should you hire a manufacturer-installer or a separate contractor?
The first decision is who is responsible for what. A manufacturer that installs its own buildings takes the shell from coil to standing structure under one name, so there is no gap between the company that made the panels and the crew that anchored them. METCO works this way: panels are roll-formed at its Farmville, North Carolina plant, and METCO deliver and install the building, with free delivery and installation within 100 miles of any of its 28 lots. A separate contractor is the right choice for everything the shell does not include, such as the slab, electrical, plumbing and interior finish. Whichever path you take, the check is the same: one written document that says who is responsible for each part of the job, so nothing falls between two companies.
How do you verify a licence and insurance without taking anyone's word?
Ask for the licence number and look it up yourself on the state board's website; North Carolina, South Carolina and Virginia each publish contractor licence status online, and the thresholds for when a licence is required vary by state and by project value, so ask the board if you are unsure. For insurance, do not accept a photocopy. Ask the contractor to have the insurer send a certificate of insurance directly to you naming your project, and check that both general liability and workers' compensation are listed with dates that cover the install. Workers' compensation matters because a crew member hurt on your property without it can become your problem. Call the insurer's phone number from the certificate, not one the contractor gives you, and confirm the policy is active. This takes twenty minutes and removes the most common way a job goes wrong.
What should the written scope and deposit terms look like?
A reputable quote reads like a parts list, not a paragraph. It should state the building width, length and leg height, the panel gauge, the framing gauge, roof style, every door and window with its size and position, colors by surface, anchoring method, whether certified engineered drawings are included, and whether delivery and installation are included or billed separately. It should also say what is not included, such as the slab, permits, electrical and interior finish, so those items are not assumed. Deposit terms should be proportionate to what the money is actually funding, with the balance due on completion rather than up front; a demand for nearly full payment before anything is manufactured is a reason to slow down. Ask how the quote is priced and how long it is valid. METCO quotes from current steel pricing, typically within 24 hours; ask any supplier to itemize the same things in writing.
Which checks happen after the building is installed?
Before the final payment, walk the building with the installer. Check that anchors are installed at every location shown on the drawings, that panels are straight with fasteners seated and not overdriven, that trim is complete at every corner and opening, that doors roll and latch, and that the roof has no visible daylight at the ridge or eaves. If the county required a permit, confirm the final inspection has been passed or scheduled and who is responsible for it. Then ask for a lien waiver from the contractor and, where subcontractors or material suppliers were involved, from them as well; a lien waiver is a signed statement that the party has been paid and will not file a claim against your property. Keep the waiver, the paid invoice, the certified drawings and the permit paperwork together, because an insurer, lender or future buyer may ask for all four.